Core Insights - CNOOC's offshore wind power project (Phase I) has announced the procurement of wind turbine units, with Mingyang Smart Energy being the first candidate for the bid at a price of CNY 1.906 billion, equivalent to CNY 3,177 per kW [1] Group 1: Project Details - The project is located in the western sea area of Hainan Province, with a center offshore distance of approximately 29 km and a site area of about 60 square kilometers [3] - The planned installed capacity for the project is 600 MW, and the foundation type for the wind turbines will be steel pipe piles [3] Group 2: Bidder Information - Mingyang Smart Energy's bid was evaluated with a score of 92.65, meeting all tender requirements [3] - Other bidders included China Shipbuilding Industry Corporation and Dongfang Electric Corporation, with bids of CNY 2.087 billion and CNY 2.010 billion respectively [3] Group 3: Technical Specifications - The wind turbines must have a single unit capacity of 10 MW and be suitable for the environmental conditions of the project site, with operational temperature ranges from -10 to 45 degrees Celsius [4] - The design life of the turbines should not be less than 25 years, and they must withstand extreme wind speeds of up to 70 m/s [4]
3177元/kW!明阳预中标中海油600MW海上风电项目