Workflow
“夸父”偏滤器原型部件顺利通过专家组测试与验收
Xin Hua She·2025-10-13 05:45

Core Insights - The CRAFT facility has achieved significant progress with the successful testing and acceptance of the prototype component for the divertor, marking a milestone in China's independent design efforts in fusion technology [1] Group 1: Technical Achievements - The prototype component of the divertor has demonstrated a steady-state thermal load capacity of 20 megawatts per square meter [1] - The alignment error of the target plate surface adjacent to the plasma is less than 1 millimeter, indicating high precision in design and manufacturing [1] - This prototype is noted as the largest in international dimensions and the highest in thermal load capacity, showcasing advancements in fusion reactor technology [1]