余杭重大项目建设跑出“加速度”
Mei Ri Shang Bao·2025-10-13 22:24

Core Insights - The Wenyixi Road West Extension Project (Phase II) is a key infrastructure initiative in Zhejiang Province, aimed at enhancing transportation in the West Science and Technology Corridor of Hangzhou [1][2] - The project is divided into eastern and western sections, with significant progress reported in both, including the completion of shield tunneling operations [1][2] Group 1: Project Overview - The project is part of the "Thousand Projects, Trillion Investment" initiative and is crucial for the urban rapid road layout, specifically the "Two Rings, Eight Horizontals, Five Verticals, and Eight Connections" [2] - The overall progress of the Wenyixi Road West Extension Project has reached 58% [2] Group 2: Eastern Section Details - The eastern section includes a main tunnel and surface roads, with two 15-meter diameter shield machines having commenced operations, completing 216 rings, which accounts for 15% of the total tunneling volume [1] - The eastern section is located from the South Lake Dike to Shishan Road [1] Group 3: Western Section Details - The western section consists of a main tunnel, shield ramps, and surface roads, with the south ramp shield machine having completed 115 rings, representing 11% of the total tunneling volume [1] - The main line shield machine has been assembled and is undergoing testing, with an expected start of operations in mid-October [1] Group 4: Additional Infrastructure Developments - The Hangzhou West Station Hub South District project is also progressing, with the A Tower structure reaching the 60th floor and the B Tower at the 65th floor, both expected to complete their main structure by the end of the year [2]