南京北站率先应用“智能模板无人工厂”
Nan Jing Ri Bao·2025-10-14 02:35

Core Insights - The Nanjing North Station project is showcasing advanced technology in construction, transitioning to the above-ground structural phase with a focus on smart building practices [1][2] - The project is part of the 2025 provincial intelligent construction pilot program, emphasizing efficiency and quality through the integration of various technologies [1] Group 1: Technological Integration - The project utilizes "smart template unmanned factory" for customized and mass production of templates, enhancing construction efficiency [1] - The combination of BIM technology, big data algorithms, IoT devices, and 5G communication enables intelligent design and processing of templates, increasing template utilization from 80% to over 95% [1] - Automated systems for template cutting and processing are established, allowing for unmanned operations and improved workflow [1] Group 2: Efficiency and Productivity - The processing of a single template can be completed in one minute, with a peak daily output of over 2000 square meters, equivalent to the work of 20 carpenters [2] - The project employs a "1+1+N" smart construction platform for comprehensive digital management throughout the construction process [2] - The use of construction robots, such as ground leveling and smoothing robots, significantly enhances precision, reducing the margin of error from 10mm to under 4mm, while saving 3 to 5 laborers [2] Group 3: Collaborative Construction Environment - The integration of algorithms and data creates a dynamic construction environment where human and machine collaboration is optimized under a "smart brain" system [2]