Core Viewpoint - Nanjing Metro Line 6 is advancing its construction, focusing on station and interval civil engineering, equipment installation, and station decoration, with a design concept that integrates the city's natural geography and historical context into an underground artistic space [1] Group 1: Construction Progress - The construction of Nanjing Metro Line 6 is in full swing, with ongoing civil engineering work and simultaneous equipment installation and station decoration [1] - The starting station, Qixia Mountain Station, is nearing completion, featuring a decorative ceiling that mimics traditional architectural styles [1] Group 2: Design and Aesthetics - The design philosophy of the stations is based on "mountain, water, city, and forest," creating a unique underground artistic environment [1] - A striking art installation of maple leaves, made of thousands of realistic-looking pieces, enhances the station's atmosphere, reflecting the autumn scenery of Qixia Mountain [1] Group 3: Connectivity and Impact - Metro Line 6 spans 32.365 kilometers, connecting various districts including Qixia, Xuanwu, Qinhuai, Yuhuatai, and Jiangning, linking key areas such as Qixia Mountain and Nanjing South Station [1] - Once operational, the line is expected to alleviate traffic pressure in Nanjing's city center and reduce travel time between the main urban area and surrounding regions, enhancing the city's rail transit network [1]
地铁6号线栖霞山站装修接近尾声
Nan Jing Ri Bao·2025-10-15 00:08