Core Insights - Fluence Energy, Inc. and Torch Clean Energy are collaborating on the Winchester project, a solar-plus-storage facility in Cochise County, Arizona, utilizing Fluence's Gridstack Pro 5000 energy storage solution, with delivery expected in early 2027 [1][2][4] Company Overview - Fluence Energy is a global leader in intelligent energy storage systems and asset optimization software, with a focus on creating a more resilient grid and enhancing renewable energy portfolios [7] - Torch Clean Energy specializes in developing and operating renewable energy assets, having originated and sold over 1.2 gigawatts of renewable power assets [5] Project Details - The Winchester project will feature two 80 MW solar arrays, providing a total of 160 MW / 640 MWh of energy storage capacity [2] - The Gridstack Pro 5000 solution will include domestically manufactured components, qualifying the facility for domestic content tax credits and supporting U.S. manufacturing [3] Economic Impact - The project aims to support grid balancing, forecasted load growth, and economic development in Cochise County, Arizona [2][4] - Fluence has deployed or contracted over 22 GWh of battery energy storage capacity across more than 90 projects in the U.S., enhancing the reliability and cost-effectiveness of the grid [4]
Fluence and Torch Clean Energy Partner to Deliver 160 MW / 640 MWh Winchester Battery Energy Storage System