2025年非采暖期第三次供热管网冷态运行启动
Zheng Zhou Ri Bao·2025-10-16 01:08

Core Viewpoint - Zhengzhou Thermal Group is conducting a cold operation of the heating network from October 15 to October 16, 2025, to ensure the safety and stability of the heating system for the upcoming winter [1] Group 1: Operational Details - The cold operation will start at 9 AM on October 15 and end at 5 PM on October 16, focusing on testing the heating equipment and facilities [1] - The heating system will maintain a cold water circulation state while gradually increasing the operating pressure [1] - This operation aims to simulate the heating conditions for the winter and adjust the heating areas across the city [1] Group 2: Monitoring and Response - During the cold operation, thermal operation personnel will monitor the heating network continuously to ensure safe and stable operation [1] - Enhanced inspection and troubleshooting will be conducted to promptly identify and address any network or equipment failures [1] - Citizens can report any abnormal situations, such as leaks, by calling the customer service hotline, and repair personnel will respond quickly [1]