珠江流域多举措防范暴雨“车轮战” 守护流域安澜
Zhong Guo Xin Wen Wang·2025-10-16 03:56

Core Points - The Pearl River Basin has implemented multiple measures to prevent flooding during a series of severe rainstorms and typhoons, achieving significant success in flood control and water storage goals [1][3][4] Group 1: Flood Control Measures - The Pearl River Basin faced challenges with 314 rivers experiencing floods above warning levels since the 2025 flood season [3] - The Pearl River Commission has coordinated with provincial water departments to enhance flood prevention and response efforts, achieving a unified approach to water engineering management [3][4] - A comprehensive flood control plan was developed, expanding the number of jointly managed water projects from 38 to 45 [3] Group 2: Water Resource Management - The Commission has effectively managed water levels in key reservoirs, ensuring a storage capacity of 308 billion cubic meters was prepared for flood control [3][5] - As of October 14, key reservoirs in the upper reaches of the Xijiang River had an effective storage capacity of 214 billion cubic meters, with storage rates exceeding 95% [5] Group 3: Impact of Flood Control Efforts - During the flood season, 3,281 large and medium-sized reservoirs in the Pearl River Basin were utilized, preventing flooding in 575 towns and protecting 2.77 million acres of farmland [4] - The flood control measures successfully avoided the occurrence of major floods in the Xijiang, Beijiang, and Dongjiang rivers, ensuring the safety of the region [4]