国网政和县供电公司:优化线路网架结构 赋能朱子文化振兴
Zhong Guo Neng Yuan Wang·2025-10-16 09:27

Core Viewpoint - The company is enhancing power supply reliability to support the stable electricity demand of the newly established Zhuzi Filial Piety Museum, which serves as a cultural landmark for the preservation of Zhuzi culture [1][5]. Group 1: Project Implementation - On October 16, the State Grid Zhenghe County Power Supply Company conducted live T-connection work on the 10 kV Tie Da Line to ensure reliable power supply for the museum [1]. - The museum utilizes modern digital technologies such as interactive display screens and intelligent interpretation systems to revitalize the preservation of Zhuzi culture [1]. - The company formed a special task force to conduct multiple on-site inspections and optimize the power supply infrastructure, ensuring high-quality construction of the cultural venue [1][5]. Group 2: Challenges and Solutions - The construction site is located in a rural area with complex environments and narrow access roads, making it difficult for live working vehicles to reach the site [3]. - The company adopted an insulated scaffolding method to facilitate construction, ensuring that the power supply to surrounding residents and businesses remained uninterrupted during the operation [3]. - The entire operation was completed in about one hour, successfully connecting the museum to a stable power supply without any disruptions [3]. Group 3: Future Plans - To address existing power supply bottlenecks, the company plans to add a new transformer and optimize the network structure to enhance supply reliability for the museum's electronic systems and equipment [5]. - The company aims to accelerate the upgrade of rural power grid structures, focusing on improving supply capacity and service quality to support the transmission of traditional cultures like Zhuzi culture [5].