Workflow
雅万高铁开通运营两周年累计发送旅客超1200万人次
Zhong Guo Xin Wen Wang·2025-10-17 04:40

Core Insights - The Jakarta-Bandung High-Speed Railway (JKT-BDG HSR) has successfully operated for two years, transporting over 12 million passengers and achieving a maximum daily ridership of 26,770 [1][2][4] - The railway has significantly reduced travel time between Jakarta and Bandung from over three hours to just 46 minutes, providing a safe, green, efficient, and comfortable travel option for local residents [2][4] - The operation has positively impacted local economies, enhancing connectivity and fostering the growth of small and medium enterprises along the railway line [4] Operational Performance - The JKT-BDG HSR spans 142.3 kilometers with a maximum operational speed of 350 km/h, and has completed over 5.65 million kilometers of safe operation with a punctuality rate exceeding 95% [2][3][4] - The number of daily train services has increased from 14 at the start to a peak of 62, adapting to rising passenger demand [2][4] - The railway has implemented advanced safety management systems and emergency response plans tailored to Indonesia's unique climate challenges [3][4] Service Quality - The railway offers flexible pricing and multiple payment options, including cash, bank cards, and e-wallets, with over 85% of tickets purchased online [2][4] - Onboard services have been diversified to include food and beverage options, enhancing the overall passenger experience [2][4] Economic Impact - The JKT-BDG HSR has transformed the transportation landscape between Jakarta and Bandung, facilitating economic development and tourism [4] - The railway has attracted over 500,000 international tourists since its opening, contributing to the rapid growth of the local tourism economy [4]