Core Viewpoint - The completion of the last cast-in-place beam marks a significant milestone for the Gutan Road North Section project in Wuhan, which is expected to be fully operational by the end of the year, enhancing regional connectivity and alleviating traffic pressure [1][14]. Group 1: Project Overview - The Gutan Road North Section project spans 2,786 meters, connecting Qiaokou District in the south to Dongxihu District in the north, serving as a crucial north-south traffic artery in western Hankou [3]. - The design incorporates a "main elevated road + ground auxiliary road" structure, with the elevated bridge width ranging from 17 meters to 37.5 meters, accommodating 4 to 8 lanes in both directions [3]. Group 2: Construction Details - Approximately 2,200 cubic meters of concrete were used for the final beam, with the project team implementing specialized control measures for large-volume concrete pouring, including temperature control and temporary structure monitoring [8][12]. - The construction faced multiple challenges, including high standards for bridge engineering, complex urban traffic organization, and limited construction space, prompting the project company to adopt a quality-first and safety-first construction philosophy [12]. Group 3: Impact and Benefits - Upon completion, the elevated bridge is expected to significantly reduce travel time for 220,000 residents along the route from 30 minutes to under 3 minutes, effectively connecting Qiaokou District and Dongxihu District [14]. - The project will eliminate traffic barriers between Qiaokou and Dongxihu, filling regional transportation gaps and optimizing the road network layout in western Wuhan, thereby enhancing overall traffic connectivity [18].
古田一路北段年底通车,硚口与东西湖有了快速通道
Chang Jiang Ri Bao·2025-10-17 08:43