Workflow
雅万高铁开通运营两周年 累计发送旅客超1200万人次
人民网-国际频道 原创稿·2025-10-17 08:51

Core Insights - The Jakarta-Bandung High-Speed Railway (JHR) has been operational for two years, transporting over 12 million passengers and achieving a peak daily ridership of 26,700 [1][2] - The railway has significantly improved transportation efficiency and service quality, with daily train operations increasing from 14 to 62 during peak periods [1][2] Transportation Capacity - The JHR team has dynamically optimized train operations to accommodate growing passenger demand, making it one of Indonesia's busiest rail lines [1][2] - The average carbon dioxide emissions per kilometer per passenger is only 6.9 grams, showcasing its green and low-carbon impact compared to fuel vehicles [1] Service Experience - The operational team has introduced flexible pricing and various payment methods, with online ticket sales accounting for over 85% of total sales [1][2] - Major stations along the route are equipped with dining and convenience store facilities, and onboard services include coffee, light meals, and cold drinks [1] Safety Management - The Sino-Indonesian team has implemented advanced safety monitoring systems and disaster prevention equipment, achieving a train punctuality rate of over 95% [2] - Nearly 600 local personnel have been trained to enhance local operational capabilities [2] Economic Impact - The JHR has transformed the transportation landscape between Jakarta and Bandung, facilitating economic and social development along the route [2] - The opening of Karawang Station has improved connectivity for local industrial parks, making it a key point for foreign investment [2] - The railway has also stimulated tourism, attracting over 500,000 international tourists and fostering the development of small and medium enterprises [2]