中国能建中电工程西北院签约同华轩岗二期2×66万千瓦总承包项目
Core Viewpoint - China Energy Engineering Corporation (中电工程) has successfully signed a total contracting project with Jinneng Holding Shanxi Electric Power Co., Ltd. for the construction of two 660 MW ultra-supercritical coal-fired generating units in Shanxi Province [1] Group 1: Project Details - The project, named Tonghua Xianggang Phase II, is located in Xuangang Town, Yuanping City, Shanxi Province [1] - It involves the construction of two 660 MW ultra-supercritical, once reheated, direct air-cooled coal-fired generating units [1] - The project will also include the installation of desulfurization, denitrification, and dust removal facilities [1]