Core Points - The Ningxia region has completed 430 kilometers of standardized levees along the Yellow River since the start of the 14th Five-Year Plan, enhancing flood protection [1] - A total investment of 36.7 billion yuan has been made in water conservancy projects, optimizing the layout, structure, and functionality of water infrastructure [1] - The region has improved its flood control capacity by managing 669 kilometers of river and reinforcing 74 reservoirs over the past five years [1] - A comprehensive rainwater monitoring and forecasting system has been established, consisting of 13 meteorological radars, 2,352 rain gauge stations, 272 hydrological stations, and 311 water level stations [1] Future Plans - During the 15th Five-Year Plan, Ningxia aims to enhance its water network through the "Four Waters and Four Determinations" strategy, optimize project layouts, restore river and lake ecosystems, and strengthen digital water management [2]
“十四五”以来黄河宁夏段标准化堤防达430公里
Zhong Guo Xin Wen Wang·2025-10-21 07:25