Core Points - The Jinchuan Hydropower Station has officially entered the countdown to production with the completion of water storage, marking a significant milestone for the National Energy Group [1] - The project has a total installed capacity of 860 megawatts and is a key construction project in Sichuan Province's 14th Five-Year Energy Development Plan [1] Group 1 - The Jinchuan Hydropower Station is located in the Aba Tibetan and Qiang Autonomous Prefecture of Sichuan Province and is the sixth hydropower station in the Dadu River's 28-level planning scheme [1] - The station is expected to generate an average annual power output of approximately 3.5 billion kilowatt-hours, replacing about 1 million tons of coal consumption and reducing carbon dioxide emissions by approximately 2.6 million tons annually [1] - The construction of the station faced significant geological challenges, including deep sediment layers and fractured rock formations, requiring advanced construction techniques [1] Group 2 - The project incorporates Building Information Modeling (BIM) technology to assist in geological analysis, construction simulation, and risk assessment, establishing a national standard for the full lifecycle information model of hydropower projects [1] - An ecological fishway, the longest in Asia, has been constructed to protect migratory fish species in the Dadu River, demonstrating a commitment to environmental conservation [2]
大渡河金川水电站进入投产倒计时
Zhong Guo Jing Ji Wang·2025-10-21 07:47