Workflow
大唐蒙东新能源事业部全面启动党的二十届四中全会保电实战 筑牢电力供应安全防线
Zhong Guo Neng Yuan Wang·2025-10-21 09:05

Core Viewpoint - The Datang Mengdong New Energy Division has officially entered the power supply guarantee phase for the 20th National Congress of the Communist Party of China, implementing a comprehensive six-day power supply assurance task to ensure stable electricity supply during the conference [1][3]. Group 1: Organizational Measures - The division has issued a special power supply guarantee plan, with operational centers quickly responding to deploy high standards and strict requirements for power supply measures [1]. - An organizational system has been strengthened, with responsibilities assigned to all personnel to ensure detailed breakdown of power supply tasks across the entire chain [1]. Group 2: Risk Management - The division focuses on key production areas, conducting a "look back" on hidden dangers in conjunction with autumn inspections, establishing a problem ledger, and ensuring dynamic resolution of issues to eliminate risk blind spots [1]. - A "non-essential work not permitted" control mechanism is strictly enforced, enhancing supervision of high-risk operations such as high-altitude and confined space work [1]. Group 3: Operational Strategies - Operational centers are optimizing station operation strategies through intelligent monitoring systems, enhancing real-time monitoring of key parameters such as irradiance and power output [3]. - Environmental control measures are being upgraded, particularly in regulating solid waste disposal processes [3]. Group 4: Emergency Response - The emergency response system has been fully activated, conducting targeted drills for extreme weather scenarios such as strong winds and heavy snow, and enhancing rapid repair capabilities for equipment failures [3]. - The division strictly implements a "daily scheduling, zero reporting" system to ensure timely reporting of power supply dynamics, reinforcing the power supply security during the conference [3].