Core Insights - The Hong Kong-Zhuhai-Macao Bridge has facilitated over 93.34 million passenger trips and 19.42 million vehicle crossings since its opening on October 23, 2018, as of October 22, 2023 [1] - The border inspection station at the bridge reported a significant increase in traffic, with 27 million passenger trips and 5.55 million vehicle crossings in 2024, marking a year-on-year growth of 17% and 25% respectively [1] - The expected traffic for 2025 is projected to exceed 30 million passenger trips and 6 million vehicle crossings [1] Passenger Flow Analysis - The increase in "southbound" passenger flow is a key driver of the port's traffic growth, attributed to the expansion of individual travel permits and the implementation of policies allowing multiple entries within a week [2] - In 2023, over 10.15 million mainland travelers were inspected at the bridge, with more than 4.6 million holding travel permits to Hong Kong and Macao, both figures representing historical highs since the bridge's opening [2] Vehicle Flow Analysis - The bridge has significantly reduced travel time from Hong Kong to Zhuhai and Macao from 3 hours to approximately 45 minutes, contributing to a surge in "northbound" traffic [2] - The average daily vehicle flow at the bridge has increased from about 9,000 vehicles in 2023 to over 18,000 vehicles in 2025 [2]
港珠澳大桥开通7周年 客流量超9300万人次
Xin Hua She·2025-10-22 09:17