Core Viewpoint - BP and JERA have decided to discontinue their joint offshore wind venture, JERA Nex bp, in the US due to significant political pushback and challenges in the offshore wind sector [1][2][3]. Group 1: Project Details - The planned 2.5 gigawatt (GW) Beacon wind farm off Massachusetts is directly impacted by the decision to cease operations [1]. - The joint venture, JERA Nex bp, was established in December 2024 and officially launched in August 2025, with a combined net potential generating capacity of 13GW [3][4]. - The venture includes 1GW of installed net generating capacity, a development pipeline of 7.5GW, and secured leases amounting to 4.5GW [4]. Group 2: Challenges Faced - The US offshore wind industry is experiencing significant challenges, including supply chain disruptions, inflation, and political risks, particularly for projects in federal waters [2]. - The current political environment under President Donald Trump has led to a halt in several offshore wind projects, creating uncertainty for future developments [1][2]. Group 3: Future Plans - Despite ceasing operations, JERA Nex bp will retain lease rights for the Beacon project and will monitor the situation for a more favorable time to restart development [3].
BP JERA offshore wind joint venture to cease US operations