Core Points - The Beijing Infrastructure Investment Company has released the Environmental Impact Report for the connection project between the Yizhuang Line and Lines 5 and 10, which is set to start construction by the end of 2025 [1] - The project aims to connect the Yizhuang Line directly with Line 5 and provide a transfer at the same platform for Line 10, significantly improving transit efficiency and reducing transfer times for passengers [4][5] Summary by Sections Project Overview - The connection project will span approximately 2.7 kilometers, with about 2.2 kilometers being newly constructed underground and 0.5 kilometers utilizing existing lines, all of which are underground [2] - The construction methods will include shield tunneling, open-cut, and deep excavation, with no blasting operations involved [2] Current Challenges - The existing Yizhuang Line does not provide direct access to the city center, and the 17th Line does not reach the core area of Yizhuang, highlighting the need for improved connectivity [2] - The Songjiazhuang Station is currently the only transfer point between Yizhuang New Town and the city center, experiencing high passenger flow and requiring urgent improvements [4] Expected Benefits - The project is part of the third phase of Beijing's urban rail transit construction plan, which will enhance service levels and efficiency of the subway system [4] - It is estimated that the project will reduce the transfer passenger flow at Songjiazhuang Station by approximately 10,000 during peak hours, alleviating congestion [4] - Daily, around 71,000 passengers will benefit from not needing to transfer, with 36,000 changing to same-platform transfers, and 65,000 adjusting their transfer stations, thus shortening transfer distances significantly [4]
年底开工,地铁亦庄线将与5号线直连直通,为宋家庄站减压
Bei Jing Ri Bao Ke Hu Duan·2025-10-22 13:42