Core Viewpoint - During the "14th Five-Year Plan" period, Jinzhong City has achieved significant progress in transforming its economy, focusing on high-quality development through industrial structure optimization, traditional industry upgrades, new momentum cultivation, and energy reforms [1][3]. Industrial Structure Optimization - Jinzhong City aims to build a modern industrial system characterized by high-end, intelligent, and green development, with a focus on professional and integrated service industry expansion [3]. - By 2024, the contribution of the three major industries to the city's GDP is projected to be 6.3:42.8:51, with the industrial sector's share increasing by 2.3 percentage points compared to 2020 [3]. Traditional Industry Upgrades - The city is leveraging its resource endowments to accelerate the digital transformation of coal mining and eliminate outdated coking capacities, transitioning from traditional manufacturing to advanced intelligent manufacturing [3]. - By 2024, advanced capacities in coal and coking industries are expected to reach 98% and 100%, respectively [4]. - The annual growth rates for industries such as casting, steel, and glass have been 13.5%, 12.7%, and 8.5%, respectively, outpacing the average growth rate of regulated industries [4]. New Momentum Cultivation - Jinzhong City is fostering new production capacities in emerging industries such as new energy vehicles and new materials [4]. - A total of 244,000 new energy vehicles have been produced, accounting for 78.3% of the province's total, establishing the longest and most comprehensive industrial chain in the province [4]. - The new materials industry, primarily based on carbon materials, has seen an annual growth rate of 15.8%, becoming the largest and most robust strategic emerging industry in the city [4]. Energy Reform - The city is actively promoting a green and low-carbon energy transition, with rapid development in photovoltaic and wind energy sectors, and a burgeoning energy storage industry [4]. - By the end of 2024, the total installed capacity of renewable and clean energy is expected to reach 7.85 million kilowatts, making up 57% of the total installed capacity, an increase of 26.5 percentage points from the end of 2021 [4]. Overall Assessment - The "14th Five-Year Plan" period has seen simultaneous improvements in the quality and efficiency of Jinzhong City's transformation, significantly enhancing industrial resilience and vitality, laying a solid foundation for comprehensive high-quality development [4].
“十四五”山西晋中转型发展质效双提升 产业韧性与活力显著增强
Zhong Guo Xin Wen Wang·2025-10-23 08:50