Workflow
“拓荒牛”始发在即!大湾区这一时速350公里高铁进度刷新
Nan Fang Du Shi Bao·2025-10-24 15:17

Core Insights - The launch of a large-diameter shield machine, featuring the "Pioneer Bull" design, marks a significant advancement in the construction of the Shenzhen to Shenshan Cooperation Zone Railway (Shenshan High-speed Railway) [1] - The Shenshan High-speed Railway is the first high-speed rail line in the Guangdong-Hong Kong-Macao Greater Bay Area, designed for a speed of 350 km/h, connecting key urban areas [1][2] Group 1 - The Shenshan High-speed Railway has a total length of 125.5 kilometers, starting from Xili Station in Shenzhen and connecting to four major transportation hubs [1] - The project is a crucial part of the national "Eight Horizontal and Eight Vertical" high-speed rail network and aims to enhance the rail transport infrastructure in the Greater Bay Area [1] - The Longgang Tunnel, a key section of the railway, is 10,307 meters long and designed for a speed of 350 km/h, utilizing both shield and mining construction methods [1] Group 2 - Construction of the Shenshan High-speed Railway began in January 2021, with a high bridge-tunnel ratio of 92.6%, currently in critical shield construction stages [2] - Upon completion, travel time from Shenzhen to the Shenshan Cooperation Zone will be reduced from 47 minutes to 30 minutes, significantly improving connectivity to the eastern Guangdong city cluster [2] - The railway will facilitate access to the Haixi city cluster in 2 hours and the Yangtze River Delta city cluster in 5 hours, optimizing Shenzhen's external rail connections [2]