Core Insights - HIVE Digital Technologies has surpassed 22 EH/s in Bitcoin-mining capacity, achieving a 267% year-to-date growth while transitioning Tier-1 data centers to Tier-3 HPC facilities for AI Cloud expansion in Sweden [2][3][11] Group 1: Mining Capacity and Efficiency - The company has reached a production level of 9.5 Bitcoin per day with a fleet efficiency of approximately 17.8 J/TH and a mining margin of 55% after electricity costs at a $47 Hashprice, showcasing operational efficiency across multiple countries [4][5] - HIVE anticipates reaching 25 EH/s by U.S. Thanksgiving, with a targeted fleet efficiency of 17.5 J/TH, indicating that growth in EH/s is significant for revenue and cash flow expansion [5][12] Group 2: AI Cloud Expansion - HIVE is converting a Tier-1 data center in Boden, Sweden, into a Tier-3 liquid-cooled HPC facility, which is expected to accelerate cash flow generation compared to traditional greenfield builds [6][7] - The upgraded facility will support 2,000 NVIDIA GPUs for enterprise-grade AI workloads, building on two years of AI operations in Stockholm [7][9] Group 3: Strategic Growth and Infrastructure - HIVE has secured power and land at three strategic locations for next-generation renewable-powered HPC operations, including the BUZZ data center in Toronto, which will host an additional 2,000 GPUs in 2026 [8][9] - The company’s Paraguay expansion is fully funded and supported by fixed-rate hydroelectric power, ensuring predictable and scalable economics [12] Group 4: Executive Commentary - Company executives emphasize the significance of crossing the 22 EH/s milestone and the strategic conversion of data centers, positioning HIVE as a dual-engine digital-power company bridging blockchain and AI [11] - The operational strength allows simultaneous growth in Bitcoin mining and AI Cloud services, all powered by renewable energy [11] Group 5: Future Outlook - HIVE targets 25 EH/s by late 2025 and 35 EH/s during 2026 while scaling its HPC division five-fold over the same period, indicating robust annual recurring revenue potential from both Bitcoin production and AI Cloud contracts [12]
HIVE Digital Technologies Surpasses 22 EH/s and Accelerates Conversion from Tier-1 to Tier-3 Data Centers for AI Cloud Expansion in Sweden