Core Points - The grain drying center project in Changshu has been successfully electrified, providing essential power for the drying of crops from 3,000 acres of high-standard farmland [1][2] - The project includes eight drying machines, each capable of processing 30 tons of grain per day, resulting in a total drying capacity of 240 tons per day when operating at full capacity [2] Group 1 - The grain drying center is located in Xinyuan Village, primarily serving rice and wheat cultivation [1] - The project was expedited by the State Grid Changshu Power Supply Company, which reduced the connection time to ensure timely operation before the autumn harvest [1] - A specialized service team was established to oversee the project, ensuring the power supply plan was both safe and efficient, while also allowing for future equipment expansion [1] Group 2 - The successful electrification of the drying center strengthens the power supply for the autumn harvest and supports rural revitalization efforts [2] - The local agricultural company expressed confidence in the reliability of the power supply, describing it as a "reassuring factor" for their operations [2]
常熟大型粮食烘干中心专变项目通电
Su Zhou Ri Bao·2025-10-28 02:58