Core Viewpoint - The simultaneous completion of the river diversion for the Mengdigou and Yagen No. 1 hydropower stations marks a significant advancement in the construction of the integrated water, wind, and solar energy base in the Yarlung Tsangpo River basin, with a total installed capacity of 2.7 million kilowatts [1][3]. Group 1: Project Details - The Mengdigou hydropower station, located in the Ganzi Tibetan Autonomous Prefecture, has an installed capacity of 2.4 million kilowatts and an average annual power generation of approximately 10.4 billion kilowatt-hours [3]. - The Yagen No. 1 hydropower station has an installed capacity of 300,000 kilowatts and an average annual power generation of about 1.15 billion kilowatt-hours [3]. - The construction of these two hydropower stations is expected to enhance the overall efficiency of water resource utilization in the river basin [3]. Group 2: Strategic Importance - The completion of the Mengdigou and Yagen No. 1 hydropower stations will further tap into the hydropower regulation potential of the Yarlung Tsangpo River, reinforcing the peak load support role of hydropower in the power grid [5]. - The Yarlung Tsangpo River basin is planned to have a total installed capacity of 78 million kilowatts by 2035, with current clean energy installations at approximately 21 million kilowatts and ongoing projects at about 14 million kilowatts [5]. - The base aims to create a 100% renewable energy supply system, positioning itself as a comprehensive demonstration base for integrated water, wind, and solar energy in the country [5].
雅砻江流域水风光一体化基地两座大型水电站同步截流
Xin Hua Wang·2025-10-28 08:01