Core Viewpoint - The article emphasizes the importance of the skeleton pipeline network in ensuring stable gas supply during winter, highlighting the proactive measures taken by the company to maintain operational efficiency and meet downstream gas demand [1][2]. Group 1: Operational Measures - The company has completed cleaning operations on 11 main pipelines, removing a total of 452.95 cubic meters of accumulated liquid to eliminate transportation bottlenecks [1]. - A comprehensive winter supply plan has been developed, with detailed task indicators and a management mechanism that ensures production tasks are delegated from top to bottom, facilitating stable production and supply [1][2]. Group 2: Technological and Maintenance Efforts - The company organized insulation work on 3,582 meters of pipelines and 1,205 valves, along with timely updates to emergency reserve materials to ensure equipment operates normally during winter [2]. - A digital production command system is utilized for real-time monitoring of gas wells, pipelines, and equipment, with increased frequency of inspections and 24-hour monitoring in key areas [2]. Group 3: Production Optimization - A technical task force has been established to implement targeted strategies for both new and old wells based on their production contributions, focusing on fine maintenance and enhancing production through a lifecycle drainage and gas extraction system [2].
中国石油长庆油田采气三厂对骨架管网开展深度“体检”