Core Points - The completion of the pile foundation for the Beijing Liushui Lian Tong flood control area project marks the official entry into the main construction phase of the project management center [1][3] Group 1: Project Overview - The project is located in the Mentougou District of Beijing and includes the renovation of the Chenglong Canal over 3.9 km, the construction of 6 new water supply pump stations, and 15.5 km of water supply pipelines [3] - Additional constructions include 2 new drainage pump stations, 3 sluices, a management center, and landscaping recovery in the Xihecha flood control area [3] Group 2: Challenges and Solutions - The project team actively engaged with owners and local relevant units to overcome challenges such as relocation difficulties and complex geological conditions [3] - During construction, the team optimized equipment scheduling and personnel allocation, strengthened safety and environmental control, and strictly implemented standardized management [3] Group 3: Project Impact - Upon completion, the project will enhance water resource regulation capabilities in the Mentougou District, addressing issues of disconnected water systems, insufficient water volume, and unstable water quality in the new city area [3] - The project aims to create a water network characterized by efficiency, greenness, intelligence, smooth circulation, and orderly regulation, laying a solid foundation for the goal of building a safe and resilient Mentougou [3]
北京六水联通滞洪区三标项目管理中心桩基浇筑完成
Huan Qiu Wang·2025-10-28 08:42