载人登月任务各项研制建设工作总体进展顺利,后续将组织完成揽月着陆器集成测试、梦舟载人飞船热试验和最大动压逃逸试验、长征十号运载火箭低空飞行及技术验证飞行等试验
Xin Hua Wang·2025-10-30 02:14
Core Viewpoint - The manned lunar mission's development and construction work is progressing smoothly, with upcoming tests planned for various components of the mission [1] Group 1 - The integration testing of the lunar lander will be organized in the near future [1] - Thermal testing of the Dream Chaser manned spacecraft is scheduled [1] - The maximum dynamic pressure escape test for the mission will also be conducted [1] Group 2 - The Long March 10 carrier rocket will undergo low-altitude flight and technical verification flights [1]