Workflow
神舟二十一号|中国人2030年前实现登陆月球的目标不动摇 长征十号将进行技术验证飞行试验
Xin Hua She·2025-10-30 06:18

Core Points - The goal of achieving a manned lunar landing by 2030 remains unchanged, with overall progress on the manned lunar mission proceeding smoothly [1] - Various flight products, including the Long March 10 rocket and the Dream Boat manned spacecraft, have completed major work in the initial sample phase [1] - The engineering team emphasizes the need for new technology validation and acknowledges the challenges and risks associated with the tight schedule and high-quality requirements [1] Group 1 - The Long March 10 rocket's second-stage power system test and other critical tests have been successfully completed this year [1] - Future tasks include integrated testing of the lunar lander and thermal tests for the Dream Boat spacecraft [1] - The upcoming mission identifiers will include the Dream Boat 1 manned spacecraft, which is primarily for lunar exploration [1] Group 2 - The project has adopted a commercial competition model for various components, including low-cost cargo transport for the space station and lunar rover development [2] - The involvement of commercial space entities has significantly accelerated the development of the project [3] - Future scientific payloads, such as lunar scientific probes, will also utilize a commercial competition model to enhance participation from commercial space forces [3]