Core Insights - The largest thermal energy storage electric boiler virtual power plant in China has been launched, integrating 16 thermal energy storage electric boilers in Zhangjiakou and Tangshan, with a total regulation capacity of 544,000 kW, enhancing grid flexibility during the heating season [1] Group 1: Virtual Power Plant Functionality - The thermal energy storage electric boiler acts as a "thermal energy bank," storing electricity as heat during off-peak hours and releasing it during peak demand, effectively lowering heating costs and facilitating "electricity transportation" [1] - State Grid Jibei Comprehensive Energy Service Co., Ltd. aggregates these dispersed thermal energy storage resources to participate in the North China power peak regulation auxiliary service market, ensuring precise load resource response and enhancing grid resilience [1] Group 2: Impact on Renewable Energy - The virtual power plant plays a crucial role in promoting renewable energy consumption in North China, where installed renewable energy capacity has exceeded 82 million kW, accounting for 76% of the region's total [2] - The North China power peak regulation auxiliary service market operates during specific time frames to manage the volatility of wind and solar power, allowing the virtual power plant to flexibly respond to energy generation fluctuations [2] Group 3: Technological Advancements - The introduction of AI models into the platform has enhanced the virtual power plant's operational data analysis, market price trend forecasting, and dynamic optimization of control strategies, significantly improving response speed and operational stability [3]
调节能力超54万千瓦!我国规模最大的蓄热电锅炉型虚拟电厂启用
Zhong Guo Dian Li Bao·2025-11-03 00:43