TSF1 Geotechnical Drilling Completed at Central Gawler Mill
Accessnewswire·2025-11-03 22:35

Core Points - Barton Gold Holdings Limited has completed geotechnical drilling for the TSF1 in support of a Definitive Feasibility Study for 'Stage 1' production at the Challenger Gold Project in South Australia [1] - The drilling program included 5 sonic drill holes for material recovery, 24 holes for Cone Penetration Testing, and 3 holes each for vein shear testing and bulk density testing [1]