Core Points - The Guangzhou-Shenzhen Railway (GSR) I and II line quality improvement project has been fully completed, allowing high-speed trains to operate at a maximum speed of 200 km/h starting November 5 [1][2] - The daily operation of trains has been optimized, with a total of 178 trains scheduled, an increase of 27 trains compared to before the upgrade, enhancing transportation capacity and efficiency between Guangzhou and Shenzhen [1][2] Summary by Sections Project Completion and Impact - The GSR I and II line quality improvement project enhances the railway's operational speed and efficiency, significantly benefiting the local population and supporting the 15th National Games [1] - The total length of the GSR is 147 kilometers, with I, II, III, and IV lines running in parallel, and the upgrade involved comprehensive renovations of tracks, bridges, power supply, and communication systems [1] Operational Enhancements - The average interval between trains is now 13 minutes, with peak times seeing trains depart every 5 minutes, further reducing travel time between key stations [2] - The number of trains running from Guangzhou East to Futian Station has increased to 36, with additional services enhancing connectivity to the Greater Bay Area [2] Ticketing and Pricing Strategy - The railway continues to implement a market-oriented pricing mechanism, offering discounts based on passenger flow, with the lowest fare set at 75% of the published price [2] - Regular ticket products have been introduced for frequent travelers, with significant discounts available for 30-day/60-trip tickets, promoting convenient travel options [2]
明起,广深铁路I、Ⅱ线动车组列车最高可按时速200公里运行