Core Insights - Teuton Resources Corp. reports successful results from the 2025 drill program at the Goldstorm deposit, confirming high-grade mineralization continuity and expanding known zones [1][4][5] Exploration Results - The final drill hole GS-25-191-W1 intersected a northeastward extension of the 300 Horizon Zone, linking mineralized intercepts between the 300H and 300N zones [2][3] - Significant mineralized intercepts include: - 4.12 g/t gold, 16.48 g/t silver, and 0.01% copper over 8.90m in GS-25-191 [3] - 1.63 g/t gold, 4.89 g/t silver, and 0.02% copper over 10.70m, stepping out 52m to the south [3] - 1.88 g/t gold, 1.71 g/t silver, and 0.01% copper over 5.90m, providing continuity between mineralized domains [3][7] 2025 Exploration Program Overview - The program targeted gaps between the 300N and 300H Zones and aimed to identify additional high-grade SC-1 Zone-like structures [4] - Drilling confirmed and expanded several high-grade corridors within and surrounding the 300N and 300H Zones [5] Future Plans - An updated Mineral Resource estimate for Treaty Creek is underway, incorporating approximately 15,000 meters of drill data from 2024 and 2025 [11] - The updated estimate will utilize a smaller block model for better resolution of high-grade gold mineralization, targeted for completion in Q4 2025 [11] - Plans for underground ramp development to access the high-grade SC-1 Zone are contingent on permit approvals, with excavation expected to commence in Q3 2026 [12] Additional Exploration Opportunities - Tudor Gold is assessing opportunities to increase gold Mineral Resources at Treaty Creek in 2026, particularly following up on drill hole PS-23-10 at the Perfectstorm Zone [13]
Teuton Reports Final Hole Drilled in 2025 at Treaty Creek
Thenewswire·2025-11-04 13:25