Workflow
国家首个水风光一体化基地获突破
Zhong Guo Dian Li Bao·2025-11-05 05:57

Core Insights - The simultaneous river diversion of the Mengdigou and Yagen I hydropower stations marks a significant milestone in the construction of China's first integrated water-wind-solar energy base in the Yarlung Tsangpo River basin [1][2][4] Group 1: Project Overview - The Mengdigou hydropower station has a total installed capacity of 2.4 million kilowatts and an average annual power generation of approximately 10.4 billion kilowatt-hours [1] - The Yagen I hydropower station has an installed capacity of 300,000 kilowatts and an average annual power generation of about 1.15 billion kilowatt-hours [1] - The completion of both stations is expected to save approximately 3.5 million tons of standard coal and reduce carbon dioxide emissions by about 9 million tons annually [1] Group 2: Integrated Energy Base Development - The Yarlung Tsangpo River basin's integrated water-wind-solar energy base is planned to have a total installed capacity of 78 million kilowatts by 2035, with current clean energy capacity at approximately 21 million kilowatts [2] - The base aims to create a 100% renewable energy supply system and serve as a comprehensive demonstration base for integrated water-wind-solar energy development [2] Group 3: Engineering and Construction Innovations - The construction of the Mengdigou hydropower station incorporates intelligent systems for full lifecycle management, enhancing efficiency by over 40% [6] - The Yagen I hydropower station employs innovative construction methods to improve safety and efficiency during the river diversion process [5][6] Group 4: Economic and Social Impact - The Mengdigou hydropower project is expected to contribute approximately 1.05 billion yuan in taxes during construction and create around 5,000 jobs annually [7] - The Yagen I hydropower station will contribute about 140 million yuan in taxes during construction and create approximately 3,000 jobs each year [7]