Workflow
首钢水系再生水引入工程开工,秀池群明湖将有新水源
Bei Jing Ri Bao Ke Hu Duan·2025-11-06 04:19

Core Viewpoint - The construction of the Shougang Water System Reclaimed Water Introduction Project has officially commenced to enhance water resource utilization in the Shougang Park and promote the protection and construction of beautiful rivers and lakes [1][3]. Group 1: Project Overview - The Shougang Park is strategically located at the intersection of Chang'an Street West Extension and the Yongding River Green Ecological Corridor, providing unique advantages for the capital's urban revival [3]. - The project aims to build a 3.21-kilometer DN300-700 water pipeline to connect the Wulituo Reclaimed Water Plant to Shougang Park, utilizing existing industrial water pipes to minimize environmental disruption and reduce investment costs [7]. - The project is expected to be completed in the second half of 2026, optimizing regional water resource allocation and enhancing water security [7]. Group 2: Current Challenges and Future Goals - Previously, the water sources for Xiuchi and Qunming Lake in Shougang Park were limited, with poor regulation capabilities due to an incomplete reclaimed water network [5]. - The "14th Five-Year Plan" period will focus on creating a new water network pattern called "One Park, Bright and Beautiful," which aims to connect water systems and meet ecological water needs for lakes and rivers in the Shougang area [9]. - The project will support the sustainable use of industrial and Winter Olympic heritage, showcasing the transformation from an "industrial rust belt" to a "living showcase" [9].