Core Insights - Gansu Province has achieved significant progress in water conservancy construction during the "14th Five-Year Plan" period, with total water investment exceeding 80 billion yuan, 1.5 times that of the "13th Five-Year Plan" period [1] - The province is expected to complete water investment of 100 billion yuan during the "14th Five-Year Plan," a 33% increase from the 75.2 billion yuan in the "13th Five-Year Plan" [1] Group 1: Major Water Projects - The completion of the second phase of the Yintao water supply project has provided over 1 billion cubic meters of water, solving water supply issues for over 6 million people in four cities and eight counties [2] - A series of major projects, including the ecological migration and poverty alleviation water supply project, have added 500 million cubic meters of new water supply capacity, optimizing the water resource allocation [2] Group 2: Rural Water Supply Improvements - Gansu has built 1,459 water storage facilities and improved 623 rural water source and pipeline projects, increasing rural tap water coverage from 90% to 95% [3] - Over 19 million rural residents now have access to safer and more stable drinking water, with urban emergency water supply coverage significantly improved [3] Group 3: Agricultural Water Management - The province has implemented modernization projects for 12 large and 40 medium-sized irrigation districts, improving irrigation areas by over 5 million acres [4] - The effective utilization rate of irrigation water has increased to 0.591, providing reliable water support for continuous grain harvests [4] Group 4: Disaster Prevention and Ecological Restoration - Gansu has enhanced its flood and drought disaster prevention capabilities, with the main river levee compliance rate reaching 75% and 124 dangerous reservoirs reinforced [5] - The province has successfully managed severe flood and drought situations, demonstrating the effectiveness of its water engineering system [5] - Ecological restoration efforts have led to the treatment of over 5,039 square kilometers of soil erosion, with a water and soil conservation rate exceeding 61% [6]
甘肃“十四五”水利建设交出硬核答卷:预计完成投资逾千亿元,筑牢水安全保障网
Zhong Guo Fa Zhan Wang·2025-11-07 09:56