Workflow
870吨/日!中企承建南美最大固废转电能项目预计于2027年投入运营

Core Insights - The Barueri Waste-to-Energy Plant in Brazil is nearing completion, aiming to address local waste management issues while generating clean energy [1][2] - The project is a collaboration between China Electric Power Construction Group Shandong Electric Power Construction First Engineering Co., Ltd. and China Energy Engineering Group Northwest Electric Power Design Institute Co., Ltd. [1] - The plant is designed to process 870 tons of solid waste daily and has a capacity of 19.1 megawatts, expected to be operational by 2027 [1][2] Group 1 - The Barueri Waste-to-Energy Plant is one of the first in Brazil and Latin America, located approximately 30 kilometers from São Paulo, a major commercial hub [1] - The project utilizes advanced Chinese waste incineration technology, ensuring that emissions meet environmental standards through multi-stage purification processes [2] - The plant aims to provide a dual solution for environmental management and clean energy supply, addressing the increasing waste management pressures in Brazil [2] Group 2 - There is significant potential for cooperation between Brazil and China in the field of green energy, leveraging Brazil's abundant resources and China's experience in large-scale applications [3] - The project reflects a growing trend towards sustainable waste management solutions in Brazil, moving away from high-pollution methods like open burning [2][3]