Workflow
山东:抓好煤炭、天然气等一次能源供应 确保人民群众温暖过冬
Qi Lu Wan Bao·2025-11-10 02:00

Core Insights - Shandong Province is accelerating the green and low-carbon development of energy during the 14th Five-Year Plan period, focusing on enhancing energy supply security and promoting renewable energy sources [1][2][3] Group 1: Energy Supply Security - The provincial energy bureau has successfully managed record-high electricity loads, with peak loads exceeding 100 million kilowatts during summer, demonstrating effective supply management [1] - The energy bureau has increased coal and renewable energy generation capacity, with over 12.37 million kilowatts of new coal power projects and more than 10 million kilowatts of wind and solar installations contributing significantly to peak power supply [1][2] Group 2: External Support and Infrastructure - Shandong has developed a robust external electricity supply framework, with the capacity to accept 38 million kilowatts from outside the province, and expects to deliver over 160 billion kilowatt-hours of electricity this year, accounting for nearly 20% of total electricity consumption [2] - The province is enhancing its natural gas supply infrastructure, with LNG receiving stations expected to reach a capacity of 28 million tons by the end of the year, ensuring a steady supply of clean energy to the region [2] Group 3: Emergency Preparedness - The energy bureau has established a comprehensive emergency reserve strategy, maintaining over 4 million tons of coal reserves and ensuring that public power plants have an average coal inventory of over 10 million tons during peak summer, with a minimum supply duration of 23 days [2] - A new energy supply plan for the winter of 2025-2026 has been developed, focusing on large-scale power generation projects and optimizing energy supply mechanisms to ensure residents have adequate heating during winter [3]