Core Insights - Fury Gold Mines Limited announced the results of its 2025 exploration drilling program at the Committee Bay project, indicating successful mineralization extension at the Three Bluffs and validation of the Raven Target [3][11] Drilling Program Overview - The 2025 drilling program included six diamond drill holes totaling approximately 2,778 meters, with four holes targeting the Three Bluffs Shear Zone and two holes testing the Raven Shear Zone [1][2] - The Three Bluffs Shear Zone intercepted gold mineralization across 315 meters of strike, with widths up to 19.5 meters, including 5.73 grams per tonne (g/t) gold over 3.0 meters [1][8] - The Raven Shear Zone returned historical drill intercepts of up to 12.60 g/t gold over 5.49 meters, with the 2025 drilling intercepting 4.59 g/t gold over 1.5 meters [2][11] Mineral Resource Estimates - The Three Bluffs Gold deposit is estimated to contain 524,000 ounces of gold in 2.1 million tonnes at 7.85 g/t in the indicated resource category and 720,000 ounces in 2.9 million tonnes at 7.64 g/t in the inferred resource category [6][7] Future Exploration Plans - The company plans to evaluate the results from the 2025 drilling to further expand known gold zones at Committee Bay and will utilize the findings to plan future work programs [3][9]
Fury Drilling at Committee Bay Extends Three Bluffs Mineralization and Expands Raven Target