Workflow
Pulsar Helium Advances Appraisal Programme with Completion of Jetstream #3 And Commencement of Testing; Rig Mobilised to Jetstream #4, Topaz Project, Minnesota, USA
Globenewswireยท2025-11-11 07:00

Core Viewpoint - Pulsar Helium Inc. has successfully completed drilling the Jetstream 3 appraisal well at its Topaz Project in Minnesota, indicating strong potential for helium production in North America [3][5][6]. Group 1: Drilling Operations - The Jetstream 3 well reached a total depth of 3,507 feet (1,069 meters) and successfully penetrated the entire interpreted helium-bearing interval [7]. - The drilling campaign includes up to 10 wells aimed at defining the geometry, extent, and productivity of the helium reservoir at Topaz [5]. - Drilling of Jetstream 4 commenced on November 9, 2025, with a target depth of 3,000 feet (914 meters) [7]. Group 2: Pressure Readings and Reservoir Potential - Initial bottom-hole pressure readings from Jetstream 3 exceeded expectations, with a calculated pressure of approximately 960 psi, indicating a robust reservoir [7]. - For comparison, Jetstream 1 and Jetstream 2 had well-head pressures of 185 psi and 205 psi, respectively, highlighting the significant improvement in pressure at Jetstream 3 [7]. Group 3: Future Plans and Assessments - The company plans to conduct a comprehensive evaluation of Jetstream 3, including geological and petrophysical data collection through open-hole wireline logs [7]. - A Preliminary Economic Assessment (PEA) is expected to be conducted in H1 2026 as part of the company's commitment to realizing Topaz's production potential [5].