安全在肩:秋查检修“精准发力”为供暖季筑牢“安全屏障”
Zhong Guo Neng Yuan Wang·2025-11-12 01:58

Core Viewpoint - The Inner Mongolia Electric Power Group's Ordos Power Supply Company has successfully completed maintenance on two main transformers and three side intervals at the 220 kV substation, ensuring reliable electricity supply during the winter heating period [1][6]. Group 1: Maintenance and Safety Measures - The maintenance work aimed to "eliminate hidden dangers" and was completed efficiently over two days, enhancing the safety and reliability of the power grid [1][5]. - A team of over 20 members from the "Electricity Warmer City" Communist Party service team conducted comprehensive inspections and maintenance on the main transformers [5][6]. - The maintenance included addressing 12 equipment defects, with all repaired equipment passing stringent insulation and pressure tests, meeting regulatory standards [6]. Group 2: Importance of the Substation - The 220 kV substation is a critical node in the regional power transmission network, supporting numerous industrial enterprises and residential communities [3]. - The operational status of the substation directly impacts the continuous operation of production lines and the reliability of heating systems during the winter [3][8]. Group 3: Future Plans - The Ordos Power Supply Company will continue to monitor the operational status of the power grid, enhancing inspection efforts to identify and rectify potential hazards [8].