Core Insights - Gold X2 Mining Inc. has reported positive results from its ongoing grade control drilling program at the Moss Gold Project, highlighting the discovery of higher-grade gold corridors [1][2][5] Summary by Sections Company Overview - Gold X2 Mining Inc. is focused on the Moss Gold Project located in Northwest Ontario, Canada, and is actively conducting a grade control drill program to enhance its understanding of gold mineralization [1][2] Drilling Results - The latest assay results from nineteen shallow drill holes indicate strong continuity of wide, near-surface, high-grade shear corridors within the Moss Main Zone [5][12] - Significant drill intercepts include: - 78.4m of 1.44 g/t Au from 15.6m in MMD-25-246, including 18.2m of 3.41 g/t Au from 74.8m - 73.1m of 1.08 g/t Au from 37.9m in MMD-25-228, including 9.95m of 2.65 g/t Au from 76.1m - 41.05m of 1.39 g/t Au from 118.4m in MMD-25-234, including 10.0m of 3.74 g/t Au from 147.0m [5][12][17] Geological Insights - The drilling program has confirmed the presence of two main parallel shears consistently containing greater than 2.5 g/t gold mineralization, which is crucial for future mining operations [12][14] - The geological model is supported by consistent and predictable geology, which will aid in future exploration targeting and mineral resource estimations [14][13] Future Plans - The company plans to utilize the data from the grade control drilling to inform an upcoming infill drilling program aimed at upgrading Inferred Mineral Resources to Indicated Mineral Resources [11][10] - The results will also contribute to feasibility-level metallurgical studies and help define high-grade zones for optimal mining sequencing [11][13]
Grade Control Drilling at Moss Main Zone Defines Higher Grade Corridors Intersecting 78.4m of 1.44 g/t Au from 15.6m
Newsfile·2025-11-13 12:00