Workflow
武汉地铁11号线,最新进展
Chang Jiang Ri Bao·2025-11-14 01:02

Core Points - The completion of the last concrete pour for the Wuhan Metro Line 11 Phase IV project marks a significant milestone, laying the foundation for the subsequent station structure capping [1] Group 1: Project Overview - The Fangcaolu Station is located at the intersection of Sixin Avenue and Fangcaolu, designed as a two-level island station, facilitating an "L"-shaped transfer with the under-construction Line 12 [3] - The total length of the Line 11 Phase IV project is approximately 16.12 kilometers, all of which are underground, featuring six stations including Jiangguo Road Station, North National Expo Center Station, Meilin Station, Fangcaolu Station, Sixin Avenue Station, and Tangshan Station, with five stations serving as transfer points [4] - The maximum excavation depth of the station's foundation pit reached 21 meters, with a total excavated earth volume of approximately 283,100 cubic meters [3] Group 2: Transportation Impact - As a major east-west transportation artery in Wuhan, Line 11 Phase IV starts from the High-speed Railway Hanyang Station, traversing Sixin Avenue and Wujin Dike Road, and ends at the Jiang'an Road Station of Line 11 Phase III [7] - The project will connect Hanyang High-speed Railway Station, the Sixin urban sub-center, and the Wuchang Baisha area, enhancing the rapid transit corridor between Hanyang, Wuchang, and Guanggu areas [7] - The completion of this line will provide an additional river crossing between Hanyang and Wuchang, significantly improving travel efficiency for residents along the route [7]