Group 1 - The article discusses a comprehensive emergency drill named "Coordinated Action: Smooth Arteries" conducted in response to the closure of Qianjiang Third Bridge starting from November 22, which aims to test the emergency response capabilities of various departments under extreme conditions [2][3] - Qianjiang Third Bridge currently accommodates approximately 163,000 vehicles daily, with around 84,000 being regular commuters, and its closure is expected to significantly increase traffic in nearby routes, particularly the Wangjiang Tunnel, which may see a 30% rise in peak hour traffic [2][4] - The emergency drill included five practical scenarios: power outage, vehicle collision, electric vehicle fire, traffic congestion, and flood emergency, demonstrating the coordinated response of traffic police, emergency services, and tunnel management [3][4] Group 2 - The drill aimed to enhance the emergency response chain from accident handling to traffic recovery, ensuring the scientific, practical, and operable nature of existing emergency plans, while improving inter-departmental coordination [4] - During the bridge closure, local authorities will utilize technology to dynamically manage vehicle flow through alternative routes and encourage commuters to use public transport, such as subways, to minimize traffic disruption [4]
杭州多部门联动开展应急演练 保障钱江三桥封闭施工期间交通平稳有序
Hang Zhou Ri Bao·2025-11-14 03:13