Core Insights - Zhengzhou's South-to-North Water Diversion project has successfully completed its water supply tasks for the 2024-2025 period, achieving a total water supply of 61.728 million cubic meters, exceeding the annual plan by 1.9% [1] Group 1: Water Supply Performance - The total water supply for the year reached 61.728 million cubic meters, with 61.428 million cubic meters allocated for domestic use, representing 101.9% of the annual target [1] - The ecological water supply amounted to 3 million cubic meters [1] - Cumulatively, since the project's inception, the total water supply has reached 6.45 billion cubic meters, with 5.56 billion cubic meters for domestic use and 890 million cubic meters for ecological replenishment, benefiting over 9 million residents [1] Group 2: Operational Management - Zhengzhou has implemented scientific and timely water supply scheduling by optimizing operational plans, adjusting equipment deployment, and refining personnel allocation based on water demand changes [1] - Daily maintenance of pump stations and pipelines has been strengthened to ensure continuous good operational conditions of the equipment [1] - The operational center has enhanced personnel management to ensure timely implementation of scheduling needs [1] Group 3: Response to Water Supply Challenges - In response to reduced water storage at the Danjiangkou Reservoir and temporary supply limitations, the operational center has engaged in collaborative discussions and dynamic scheduling to ensure normal water supply across the city [1]
郑州南水北调生活供水超额完成年度任务
Zheng Zhou Ri Bao·2025-11-17 00:55