Core Points - The first batch of high-speed trains and electric locomotives for the Malaysia East Coast Rail Link project was officially launched in Dalian, marking a significant milestone in the largest economic and trade project between China and Malaysia [1][2] - The East Coast Rail Link project, which spans 640 kilometers, is expected to be operational by early 2027 and is constructed by China Communications Construction Company [1] - The contract for 11 sets of 160 km/h electric multiple units and 12 HXD3C electric locomotives was signed in August 2022, with production starting on April 15 of this year [1] Company and Industry Summary - The high-speed trains utilize advanced Fuxing train control technology, focusing on "intelligent, high-end, and lightweight" design principles, featuring a dual-redundancy train network control system for real-time monitoring of critical systems [1] - The lightweight design enhances operational efficiency while reducing energy consumption, aligning with green manufacturing principles [1] - The trains are specifically designed to withstand local environmental conditions, including high temperatures, humidity, and frequent thunderstorms, with improved corrosion resistance and sealing for exposed components [1] - The electric locomotives exhibit significant technical features such as high starting traction, wide constant power range, and superior adhesion performance, equipped with intelligent human-machine interaction and safety protection systems for millisecond-level monitoring of critical safety aspects [2] - The delivery of the first batch of trains and locomotives to Malaysia is expected by the end of this year, with the remaining units scheduled for delivery starting in the second quarter of 2026 [2]
中车大连公司首批出口马来西亚动车组与电力机车下线