Peloton Commences the Maiden Drilling Program at the North Elko Lithium Project, Nevada

Core Viewpoint - Peloton Minerals Corporation has initiated its maiden drilling program at the North Elko Lithium Project in northeastern Nevada, targeting lithium-bearing claystone layers and other critical minerals [1][2]. Group 1: Drilling Program Details - The drilling program will consist of four widely spaced holes, each reaching a depth of approximately 500 feet, to assess the orientation, stratigraphy, and potential mineralization within the clay layers [3]. - The drill holes will be spaced about 7 kilometers (4.3 miles) apart on the NE-SW axis and about 3.5 kilometers (2 miles) apart on the NW-SE axis, with drilling expected to take around three weeks and assays to follow in about six weeks [3]. Group 2: Project Background and Exploration Work - The North Elko Lithium Project spans approximately 37 square kilometers (14.25 square miles) and is fully owned by the company, with no outstanding royalties [5]. - Prior exploration activities included an airborne hyperspectral survey, airborne magnetics, radiometric and VLF-EM surveys, geological mapping, soil geochemistry over a 32 square kilometer grid, prospecting, and XRD analysis on over 1,000 surface samples [5]. Group 3: Regulatory and Operational Aspects - The company holds two drilling permits for the property and has 24 drill pad locations permitted for future programs, all strategically located beside existing roads to minimize environmental impact [4]. - The project is located adjacent to a high-grade lithium deposit discovered in 2023 by Surge Battery Metals, indicating potential for significant mineral resources in the area [5].