Core Points - The successful completion of the right line connection between Renhe South Station and Renhe Station marks the full dual-line connection of the Hangzhou Metro Line 10 Phase III project [2] - The dual-line length between Renhe South Station and Renhe Station is 1199.9 meters, showcasing the project's efficient construction speed [2] - The Hangzhou Metro Line 10 Phase III project is a crucial link connecting Line 10 with the Hangde Intercity Railway, facilitating transportation between the Renhe area, Hangzhou city center, and Deqing [2][3] Summary by Sections Project Overview - The Hangde Intercity Railway, a key project in Zhejiang Province, connects Yuhang District in Hangzhou (Renhe North Station) to Deqing County in Huzhou (Deqing High-speed Railway Station) with a total length of 25.6 kilometers and 9 stations [3] - The project is designed for a maximum operating speed of 120 kilometers per hour and is expected to be completed and operational by 2026 [3] Construction Achievements - The project team completed the shield tunneling for both lines, with significant milestones achieved in a short timeframe, including 21 days for equipment installation and 100 days for tunneling of 800 rings [2] - The construction speed has been highlighted as "Iron Army Speed," reflecting the efficiency and effectiveness of the project team [2]
地铁10号线三期关键区间贯通 将融入杭德市域铁路运营体系
Hang Zhou Ri Bao·2025-11-19 02:22