首个配置冷却塔的“华龙一号”核电机组落地招远
Qi Lu Wan Bao·2025-11-19 12:33

Core Insights - The Shandong Zhaoyuan Nuclear Power Project's Unit 1, featuring the first "Hualong One" reactor with a cooling tower, has commenced construction, marking a significant milestone in China's nuclear power development [1][2] - The project is expected to generate an annual electricity output of 50 billion kilowatt-hours, sufficient to meet the needs of approximately 5 million people, while significantly reducing coal consumption and carbon emissions [1] Group 1: Project Overview - The Shandong Zhaoyuan Nuclear Power Project is located in Yantai, Shandong, and is the tenth nuclear power base established by China General Nuclear Power Group (CGN) nationwide, with plans for six "Hualong One" reactors [1] - The cooling tower, standing at 203 meters with a water collection area of 16,800 square meters, utilizes secondary cooling technology for the first time in a "Hualong One" unit, enhancing cooling efficiency and reducing energy consumption [2] Group 2: Technological Innovations - The project incorporates a dual cooling system combining natural and mechanical ventilation, ensuring continuous operation of the reactor for at least two hours without external water supply, thus enhancing safety [2] - Advanced construction techniques, including modular construction and automated processes, are being employed to improve construction efficiency and quality [3][5] Group 3: Environmental and Community Impact - The project aims to integrate nuclear energy into the clean heating network of the Jiaodong Peninsula, providing significant heating capacity and contributing to regional ecological improvements [5] - Each unit can supply up to 1,000 tons of steam per hour, covering over 15 million square meters for heating, which will benefit Zhaoyuan and surrounding areas [5]