Core Viewpoint - The commencement of the shield tunneling for the Taicang pilot section of the Huzhou-Suzhou-Xuzhou-Changzhou intercity railway marks a significant milestone in the construction of this key transportation link in the Yangtze River Delta region [1][2]. Group 1: Project Overview - The Huzhou-Suzhou-Xuzhou-Changzhou intercity railway serves as an important transportation link between Shanghai and Suzhou [1]. - The Taicang pilot section spans 10.24 kilometers with a design speed of 160 km/h and includes three stations: two underground and one elevated [2]. - The project is expected to enhance connectivity with multiple urban rail transit lines in Shanghai, promoting regional integration in the Yangtze River Delta [2]. Group 2: Construction Details - The shield tunneling machine "Sutiexianfeng" has begun its operation, focusing on a 4.8-kilometer section characterized by complex geological conditions [1]. - The construction team has implemented advanced technologies such as "personnel positioning," "AI vision," and "shield auxiliary driving" to ensure real-time monitoring and efficient management of the construction process [2]. - The project emphasizes safety and precision, with a dedicated technical team overseeing all phases from geological surveys to equipment assembly [2].
沪苏锡常城际太仓先导段首台盾构机“苏铁先锋号”顺利始发
Yang Zi Wan Bao Wang·2025-11-21 07:24