Core Insights - The company is proactively preparing for extreme cold weather to ensure stable energy supply during winter [1][2] Group 1: Preparation Measures - The company began preparations for cold weather in early October, completing all frost prevention measures by the end of October [1] - Effective frost prevention strategies included wrapping equipment with insulation, installing heating cables, and sealing openings [1] - Departments are closely monitoring weather changes to minimize the impact of extreme cold on equipment operations [1] Group 2: Equipment Safety Checks - Following the first snowfall, the company organized a special inspection of frost prevention measures on November 5-6 [1] - The inspection focused on the integrity of insulation materials and the operation of heating systems to prevent freezing [1] - Increased frequency of equipment monitoring was implemented, particularly for critical components like insulators and bushings [1] Group 3: Human Resource Management - The company emphasizes the importance of personnel skills and safety awareness in extreme weather conditions [2] - Standardized operation supervision and assessment for operational and maintenance staff are being reinforced [2] - Training includes practical assessments and simulations to ensure staff are well-prepared for winter operational challenges [2]
中新建电力集团天富能源发电产业:“闻低温令动” 全力迎战首场寒潮保供能